140 TON SHIP CRANE (OIL & GAS) PROJECT

SMT Shipping Ghana had a Crane Failure on one of their barges which conveys Manganese from Takoradi port to a 100,000 ton Ship for Export.
Monpe Ventures was brought in to Transport the 140 Ton Crane from the Ship to the Shore for repairs.
The Crane was placed on Stands without the need of cranes to offload after repairs were carried out. The Hydraulic trailer reverse under the crane and lifted it from the stands and transported it back to the ship.